JTB Batch Plot

JTB Batch Plot

Win32 和 64, 繁體中文

JTB World Inc.
This app for Autodesk® AutoCAD® simplifies the process of publishing (plotting) sets of drawings to DWF and/or PDF.

一般使用方式說明

Before running the application's main command, please make sure you have saved your work: AutoCAD may be restarted during the batch publishing operation, which would cause any unsaved drawing edits to be lost.

The JTBWBATCHPUBLISH command launches the main application dialog. From here you must specify the source directory or drawings to publish, as well as the targets: DWF and/or PDF (PDF is only available from AutoCAD 2010).

For each chosen target an appropriate destination directory must be specified. These settings will be remembered when the JTBWBATCHPUBLISH command is used again. From this dialog it's possible to change further configuration settings. The "Configure" button brings up a dialog allowing you to specify whether to publish DWG and/or DXF files, as well as specifying a timeout delay, after which the application will decide that AutoCAD needs to be restarted during the batch publish.

螢幕快照

指令

功能區/工具列圖示 指令 指令說明

JTBWBATCHPUBLISH

Launches the main Batch Publish application dialog.

JTBW_ACTIVATE_APPS

To activate the license

安裝/解除安裝

The installer that ran when you downloaded this app from Autodesk App Store will start installing the app. Or, double-click the downloaded installer to install the app. You may need to restart the Autodesk product to be able to run the app.

To uninstall this app, exit the Autodesk product if you are currently running it.

On Windows 11 and 10 version 1703 or later press Windows+I on the keyboard to access Settings or click or right-click the Windows Start button and then select Settings. Click on Apps (optionally followed by Apps & features). On older Window versions click Control Panel > Programs > Programs and Features or Control Panel > Add.

其他資訊

If AutoCAD is restarted, the batch publishes process should continue after the "failed" drawing. It is possible to configure individual drawings, specifying whether to publish individual layouts or not. It is possible to ignore all the model-space sheets of the included drawings.

You can also choose to publish only drawings that have been modified since they were last published, streamlining regular publishing operations. After the configuration dialog has been dismissed with the "Done" button, "Publish" will launch the operation itself. At this point two dialogs will be launched (as well as any dialogs AutoCAD needs during individual publish operations). The first is a status dialog, showing the list of drawings found in the source folder and their individual publishing status. The second dialog is an external "regulator" application, which monitors AutoCAD's status and restarts if it takes longer to publish a drawing than the specified timeout.

Once completed it's possible to use the status dialog to "Retry" the publishing process on any failed drawings. Otherwise the dialog can simply be closed with "Done": a log file will be found in each of the target folders describing the results of the batch publish. For more details visit the Batch Publish product page.

已知問題

Support for other languages of AutoCAD than English will be done upon request.

聯絡我們

公司名稱: JTB World Inc.
公司網址: https://jtbworld.com
支援聯絡: info@jtbworld.com

作者/公司資訊

JTB World Inc.

支援資訊

For support visit our Contact page.

版本歷程

版本號碼 版本說明

2.6.0

Added support for AutoCAD 2024

2.5.0

Added AutoCAD 2023 support.

2.3.2

Added AutoCAD 2022 support

2.3.1

Upgraded to License 4.3

2.1.0

Added Autodesk® AutoCAD® 2021 support. No change in version number.

2.0.0

Added support for AutoCAD® 2017 (no version number change)
移至頂端