BIM Clash Manager

BIM Clash Manager

Win64, English

FOUNTAIN Technology
Resolve, Manage and Track.

General Usage Instructions

Core Workflow:

  1. Open the model in Autodesk® Revit®.
  2. Launch Clash Manager.
  3. Import the Autodesk® Navisworks® Clash Report HTML/CSV (The contents title should only contain "Date Found", "Layer Name", "Item Path", "Item ID" and "Image")
  4. Filter by Level/Discipline/Status.
  5. Locate in the model:
    1. Find in Plan:  Opens the right plan view and centers the element.
    2. Find in 3D:  Isolates in 3D and applies Section Box automatically.
    3. Padding slider:  Adjust section box offset (e.g., 50 mm).
  6. Status management:
    1. Change the Status for one or many selected rows at once.
    2. Add a short Note (e.g., “Ø100 pipe conflicts with duct; lower duct 50 mm”)(will be added with the update)
  7. Ownership (optional):  Tag discipline or responsible person (will be added with the update)
  8. Export/Save: CSV/HTML/Excel; or update the working list.(will be added with the update)
  9. Revision loop:  After model fixes, re-check with Find in Plan/3D; mark Open/Resolved/Approved/Ignore accordingly

Screenshots

Commands

Installation/Uninstallation

The installer that ran when you downloaded this app/plug-in from the Autodesk App Store will start installing the app/plug-in. OR, simply double-click the downloaded installer to install the plug-in. You may need to restart the Autodesk product to activate the app/plug-in.

To uninstall this plug-in, exit the Autodesk product if you are currently running it, simply rerun the installer, and select the "Uninstall" button. OR, click Control Panel > Programs > Programs and Features (Windows) and uninstall as you would any other application from your system.

Additional Information

FAQ

Q: The Navisworks report has no Level?
A: If Layer exists, it auto-maps to Level; otherwise, set Level manually or rely on Path/ElementId.

Q: How are ElementIds matched?
A: Directly from the report if present; otherwise, parsed from the Path tail segment per your rule.

Q: Why force 3D with Section Box?
A: To isolate context quickly; adjust Padding to widen/narrow the box.

Q: Why bulk status change?
A: To process similar clashes together and shorten meetings.

Q: Can I export?
A: No, but the next version will have this feature.

Security & Data

  • Works with local model data. Only exports data when you choose to export. No server transmission unless explicitly configured to do so.

Support & Feedback

  • Need special field mappings or formats? Small config tweaks can be provided. For bugs/requests, contact via email; a quick turnaround is aimed for.

Known Issues

When exporting (html) the Navisworks clash report, please select only the specified options, otherwise, the clash photos in the application may not reflect the reality.

Contact

Company Name: FOUNTAIN Technology
Support Contact: ugurbuyukbas1@gmail.com

Author/Company Information

FOUNTAIN Technology

Support Information

Email: ugurbuyukbas1@gmail.com

Hours: Mon–Fri 09:00–18:00 (UTC+3). Typical response time: 12–48 hours.

For faster resolution, please include:

  • Revit version and Clash Manager version
  • Error message/screenshot
  • Reproduction steps and a sample file (if available)

 

Updates and known issues are posted on the Autodesk App Store page. Remote assistance can be arranged if needed. Support is provided for current versions only. Any personal data shared during support is used solely for communication and troubleshooting and is not disclosed to third parties

Version History

Version Number Version Description

1.0.0

Initial Release.
Go top