Time Tracker Pro
免费
操作系统:
语言:
描述
The Time Tracker tool allows you to automatically record the time spent on each project, along with the corresponding number of actions performed. This dual-metric approach ensures that productivity is accurately assessed, preventing misleading interpretations when only time is tracked.
Once installed, the Time Tracker add-in for Autodesk® Revit® automatically captures project activity without requiring any user intervention. By continuously recording both the duration of work and the number of actions performed, it generates a dynamic dashboard with five distinct sections:
- General Information: Displays key project details, including the project name, current date and time, and the identifier of the user who generated the dashboard.
- Work Time: This shows the total accumulated work time for the project and the specific work time logged on the current day.
- Hourly Operation Frequency: Displays a visual breakdown of the number of actions performed per hour for each day, ensuring a clear and precise correlation between recorded work time and actual daily productivity.
- Global Statistics: Presents comprehensive metrics such as the start date of activity tracking, the total number of unique days recorded, and the average hours worked per day on the project.
- Copy to Clipboard: This generates an image snapshot of the dashboard, making it effortless to share the report via email, chat, or other editing software with a simple copy-and-paste action.
If I open two or multiple projects at the same time, it is only showing time duration for the 1st project.
Thank you for your feedback, Saurabh ! To help me address this properly, could you please clarify what you mean by "two or multiple projects at the same time" ? Are you referring to two separate Revit sessions/windows, or multiple projects opened within the same Revit session ? Also, could you specify what you consider to be the "first project" ? That would help me understand the context better and make the necessary adjustments. Thanks again for pointing this out !
Thank you for your reply. I was talking about Multiple projects in same Revit session.
Thank you for your reply. I was talking about Multiple projects in same Revit session. And First Project means if I open "Project01" first and then "project02" in same revit session, timer will show only "Project01" data. Thank you